Detail Engineering regarding the prefabrication and erection of the external piping of the new FCC Gasoline Hydrotreater Unit, between the Battery Limit of the a.m. Unit and the Tie-ins of the existing Process and Utilities piping.
Detail Engineering regarding the prefabrication and erection of the external piping of the new FCC Gasoline Hydrotreater Unit, between the Battery Limit of the a.m. Unit and the Tie-ins of the existing Process and Utilities piping.