Preliminary Study for the Extension of Jet-A1 Storage Capacity, envolving:
- 3 Metallic tanks with an unitary capacity of 500 m3;
- Unloading and Loading Facilities for Jet-A1 in tank trucks;
- Water and Foam systems for Firefighting;
- Lighting, Power, Earthing, Instrumentation, Control and Automation systems.
Preliminary Study for the Extension of Jet-A1 Storage Capacity, envolving:
- 3 Metallic tanks with an unitary capacity of 500 m3;
- Unloading and Loading Facilities for Jet-A1 in tank trucks;
- Water and Foam systems for Firefighting;
- Lighting, Power, Earthing, Instrumentation, Control and Automation systems.
Detail Design for the construction and Work Preparation for the manufacturing of two Steam Reformers, for erection at Novokuibyshevsk, in Russia.
Final Design, mechanical and electrical, related with the JP-8 Fuel Loading for Helicopters at Tancos Air Base.
Basic Engineering and Final Design, mechanical, civil and electrical, as well as Technical Support, for the construction of a new Storage Plant for 40.000 m3 of fuel oil and 10.000 m3 of diesel, next to the Nordela Fuels Storage Tank Farm.
Preliminary Study, Technical Documentation for Licensing by the City Council of Almada, Final Design and Technical Specification, architectural and civil engineering, for the Licensing and Erection of the new Extraction By Solvent Plant, at the facilities of Palença de Baixo – Almada.
Basic Engineering and Final Design, mechanical, civil and electrical, as well as Technical Support, related with the Revamping of SONANGOL’s ICLI Fuels Tank Farm.
Basic Engineering consolidation and Final Design, mechanical and civil, related with the Reception, Storage, Additivation and Expedition of 80.000 m3 of Diesel in Matosinhos Refinery.
Basic Engineering and Final Design, mechanical, civil and electrical, as well as Technical Support, for the Construction of a Reception, Storage and Expedition Tank Farm of Liquid Fuels (diesel, petrol 95, petrol, Jet-A1 and Kerosene) at Menongue.
Preliminary Study and Final Design, related with the Revamping of São Roque Fuels Tank Farm, envolving its extension, operational improvement and conformity with the applicable legislation.