Final Design (mechanical) of the new piping systems, composed by 273 new lines, to be installed in the Units “Destilação de Pesados e de Reacção”, in the scope of the Aniline Plant Expansion, existing in CUF industrial installations in Estarreja.
Final Design (mechanical) of the new piping systems, composed by 273 new lines, to be installed in the Units “Destilação de Pesados e de Reacção”, in the scope of the Aniline Plant Expansion, existing in CUF industrial installations in Estarreja.